GlowUp Get the app

GlowUp

Reveal your glow with an AI face scan.

Ever wondered what your face actually scores? GlowUp reads one selfie across six dimensions — no filters, no flattery — then builds the routine to improve them.

App Store Google Play

Analyze your face, track your glow-up. Free to start on iOS and Android.

Editorial portrait in warm, low light — the kind of photo a GlowUp scan reads
GlowUp score screen listing all six dimensions with individual scores

The breakdown

One selfie. Six honest scores.

The Aura Score is the headline number — your overall glow score from 0 to 100. Under it, five dimensions tell you where that number comes from and which one to work on first.

How the Aura Score reads

  1. Building under 65
  2. Balanced 65+
  3. Glowing 80+
  4. Radiant 85+
  5. Excellent 90+

How it works

Scan, read, improve. Rescan monthly.

  1. 1

    Scan

    Take one clear, eye-level selfie in even light, glasses off. The AI maps your face and returns your scores.

  2. 2

    Read

    Get your Aura Score and the six-dimension breakdown — strengths first, then focus areas.

  3. 3

    Improve

    Follow your AM and PM routines, scan products before you buy, and rescan after a few weeks — skin moves on a 3–6 week cycle, not overnight.

Not sure what to fix first? Take the priority quiz or run the photo checklist before your baseline scan.

Inside the app

The score is the start. The routine is the work.

GlowUp routine screen with morning and evening skincare steps and a 7-day streak

Routine

Morning and night, on the record

AM and PM routines built from your scan, checked off daily. Streaks make consistency visible — and consistency is what moves skin scores.

How tracking works
GlowUp product scanner rating the ingredients of a vitamin C serum as Safe, Caution, or Avoid

Product scanner

Read the label before your skin does

Scan any product barcode and GlowUp rates each ingredient Safe, Caution, or Avoid against your skin profile — before it goes in your cart.

AI skin analysis
GlowUp AI Skin Coach chat answering a skincare question

AI Skin Coach

A coach that has read your scans

Ask anything — breakouts, order of actives, what to change this week. The Skin Coach answers from your actual scores and routine history.

Try the coach
GlowUp progress chart rising from a score of 62 to 86 above a scan timeline

Progress

From 62 to 86, with receipts

Every scan lands on a timeline. Charts show which dimensions are climbing, and before/after compare proves the glow-up actually happened.

Glow-up tracker

No filters. No flattery.

Just an honest read on where you stand and what to work on — starting with the fastest lever, your skin quality.

Questions

What is the Aura Score?

The Aura Score is GlowUp’s headline face analysis number, from 0 to 100. It is a rollup of five scored dimensions — skin quality, glow potential, contour, facial structure, and symmetry — so you can see what is already working and what to improve. The app also puts a word next to it: Excellent, Radiant, Glowing, Balanced, or Building.

How many things does GlowUp actually score?

Six, counting the overall Aura Score itself: Aura Score, Skin Quality, Glow Potential, Contour, Facial Structure, and Symmetry. Every scan returns all six, plus a short summary, your strengths, and the areas worth working on ranked by priority.

Is GlowUp a looksmaxing app?

GlowUp is built for people who want honest face feedback and a plan — not just a viral rating. Scan, read the breakdown, track routines, and rescan over time to see real progress.

How does the AI face scan work?

Take or upload a clear, eye-level selfie in even light. GlowUp maps facial structure, evaluates symmetry and contour, and scores skin quality. Results include strengths, focus areas, and a personalized routine of five to eight steps split across morning and evening.

What happens to my photos?

Your photos are never stored, shared, or used for AI training, and they are deleted right after your results are created. They are processed only to produce your analysis.

Can I track progress over time?

Yes. Save scans, compare before and after, build a daily AM and PM routine, and watch score trends on a chart and a scan timeline. Streaks and history make glow-ups measurable instead of guesswork.

What is the product ingredient scanner?

Scan a skincare product barcode and GlowUp rates every ingredient against your skin profile as Safe, Caution, or Avoid, then gives the product an overall verdict — good for you, use with care, or skip it.

What does the AI Skin Coach do?

The Skin Coach is a chat that already knows your latest scan. Ask it to explain your scores, suggest an evening routine, or sanity-check a product, and the answers are built on your results rather than generic advice.

Is GlowUp free to download?

Yes. Download free on iOS and Android and take a scan. Unlimited scans, the ingredient scanner, and the AI Skin Coach are part of GlowUp Pro, which you can subscribe to weekly or annually in the app.

Start your measured glow-up

Free to start. Scan once, read the six-score breakdown, track what improves.

Free download on iOS and Android.

Download GlowUp — free scan